• <tr id='KI4U1A'><strong id='KI4U1A'></strong><small id='KI4U1A'></small><button id='KI4U1A'></button><li id='KI4U1A'><noscript id='KI4U1A'><big id='KI4U1A'></big><dt id='KI4U1A'></dt></noscript></li></tr><ol id='KI4U1A'><option id='KI4U1A'><table id='KI4U1A'><blockquote id='KI4U1A'><tbody id='KI4U1A'></tbody></blockquote></table></option></ol><u id='KI4U1A'></u><kbd id='KI4U1A'><kbd id='KI4U1A'></kbd></kbd>

    <code id='KI4U1A'><strong id='KI4U1A'></strong></code>

    <fieldset id='KI4U1A'></fieldset>
          <span id='KI4U1A'></span>

              <ins id='KI4U1A'></ins>
              <acronym id='KI4U1A'><em id='KI4U1A'></em><td id='KI4U1A'><div id='KI4U1A'></div></td></acronym><address id='KI4U1A'><big id='KI4U1A'><big id='KI4U1A'></big><legend id='KI4U1A'></legend></big></address>

              <i id='KI4U1A'><div id='KI4U1A'><ins id='KI4U1A'></ins></div></i>
              <i id='KI4U1A'></i>
            1. <dl id='KI4U1A'></dl>
              1. <blockquote id='KI4U1A'><q id='KI4U1A'><noscript id='KI4U1A'></noscript><dt id='KI4U1A'></dt></q></blockquote><noframes id='KI4U1A'><i id='KI4U1A'></i>
                中国干燥设备制造解决∮方案提供商
                全国咨询热√线
                0523-84581688

                除尘设备的安装工程


                资讯来源 :www.jsxgdry.com     2016-11-30 17:32:20   点击:
                除尘设备的安装工程
                除尘设备安装工程施工组织设计的重点,应当包括: (1)科学规划,制定安装工程目标 依靠科技创新,富集先进ξ 科学技术,充分利用人力、物力和财力资源,统筹安排,制定除尘设备安装目标,是安装工程施工组织设计的核心指标,目标管理的立足点,必须做到指标先进、措施得力、资源可靠。 (2)制订技术先进、措施配套、管理有序、运作灵活的安装方案 安装方案必须具备:指导思想明确,安装技术※先进,组织措施配套,质控保证⊙连续,运行管理到位。 (3)做好安装工程总平面的规划与利用 安装工程总平面是除尘设备安装的战场,它的科学规划和利用,直接体现其安装工程运筹帷握的战略部署,人力、物力和财力的运作动态,还有施工用水、用电及道路交通的供应路线,一个红红火火的施工场面将会全面展现出来,成为组织安装工程的战图。安装工▆程总平面图必须得到建设单位的批准或认可。 安装工程总平面图的主要内容ㄨ包括: 1)以除尘设备为中心,安装现场及其临时工程的利用原则; 2)吊装设备安装地点及其走行(影响)范围; 3)预制构件堆放和材料库、设备库的分布; 4)构件组合与临时制作地点; 5)施工用水、用电和交通道路设施; 6)工地防火及安全保卫设施; 7)现场办公和员工食宿安排。
                ?